Posts Tagged ‘Airbus’

The Wall Street Journal ran a series of articles on the challenges Airbus is facing. I will try to cover several of these, as each highlights a different issue, and I would like to begin with the one discussing the effort made by both Airbus and Boeing to fight the delays that plagued their operations during the last several years (“Hit by Delays, Airbus Tries New Way of Building Planes“.)

Both Boeing and Airbus have outsourced, during the last few years, not only their production, but also the design of the different parts, as well as the management of the suppliers’ sub-tiers. We have documented these in the past (“Boeing Delivers First Dreamliner“,) and the article, briefly mentions these. Manufacturing problems have left Boeing with more than 40 almost-completed Dreamliners awaiting fixes. Their main customers now expect to get their planes around four years late. The project has cost Boeing billions more than its initial $10 billion budge.  The reader must recall that Boeing has embarked on this ambitious outsourcing plan to reduce investment costs, and speed R&D and production. As we all know, things have not panned well for these two goals. What were the main reasons: loss of visibility of the progress of different suppliers, as well as incentive issues.  It took Boeing quite a while to figure it out, but they finally have:

In a major retreat, it has since bought up suppliers, brought work back in-house and integrated more closely with its remaining contractors.  “We gave away a lot of elements of work that we’d always done in the past, and then didn’t provide the kind of oversight necessary for some of the people that were doing work that they’d never done before,” said Boeing Executive Vice President Jim Albaugh, who ran its airplane division until June, at an investor conference last fall. To retrench, Boeing mobilized hundreds of engineers specialized in manufacturing and industrial issues, who have pored over every element of the program, including at suppliers. At its factory near Seattle, Boeing built a control room with video links to overseas suppliers, allowing its engineers to examine parts live on shop floors in Japan or Italy. For a second, larger version of the Dreamliner, Boeing opted to design many outsourced components itself, such as the plane’s rear section and tail wings.

(more…)

Read Full Post »

%d bloggers like this: